The project consists of: the replacement of HVAC in 1929 building with a boiler/chiller 2 pipe hydronic system with unit ventilators. Installation of system will include all work related to HVAC system, as well as work needed for exterior louver installation for unit vents, and installation of window infill where existing window units will be removed. Demo of existing HVAC system as outlined in the construction documents. Alternate bids for a 4 pipe system will also be included with same head end, and in space units, as well as additional glazing unit replacement are included.

Status

Bidding Closed

Prebid Date11/7/22 10:00am

Bid Date11/22/22 10:00am

Company & Contacts

BLDD Architects

Damien Schlitt - damien.schlitt@bldd.com   Liz Kessinger - liz.kessinger@bldd.com

Location

Cerro Gordo, IL 61818

Contractors may obtain electronic documents free of charge.
Printed documents may be obtained at cost from Decatur Blueprint, (217) 423-7589, by ordering through this website.

A Pre-Bid Conference will be held at the project site, at 10:00 a.m. on Monday, November 7, 2022. Persons interested in visiting the site shall contact Chris Johnson, Facility Director (217) 763-2711 ext.1116.