Cerro Gordo CUSD #100 - High School Gym Building Refacing and Window Replacement

The project consists of: Refacing of the existing 1962 gym building and 2000 addition at Cerro Gordo Junior Senior High School. Portions of refacing includes full removal of existing facebrick and replacement with full depth brick. At areas where existing brick is in better condition, thin brick will be installed over the existing face brick. In specific areas - EIFS system is shown to be installed to accomplish refacing. Portions of existing window system is also to be replaced in areas as shown. Contractor is responsible for necessary roof edge, adjustments, soffit reconfiguration, etc. as shown on documents.

Status

Bidding Closed

Prebid Date1/28/21 2:00 pm

Bid Date2/11/21 2:00 pm

Company & Contacts

BLDD Architects

Damien Schlitt   damien.schlitt@bldd.com

Location

Cerro Gordo, IL 61818

Copies of the Bid Documents may be obtained by depositing $100.00 per set. (“Central Illinois Builders’ Non-Cash Security Method for Request of Documents” will be accepted on this project). Checks shall be made payable to Cerro Gordo CUSD #100. Please choose the “Check (or Bidders Card)” for payment option during checkout.

NOTE: Do not purchase the download-only option if you are choosing the refundable deposit set. Digital purchases are a non-refundable, out-of-pocket expense.

A Pre-Bid Conference will be held at the project site, at 2:00 p.m. on Thursday, January 28th, 2021. Persons interested in visiting the site shall contact Chris Johnson, Facility Director at 217-763-2711, ext 1116.