Mahomet-Seymour CUSD #3 - High School BAS Upgrade

The project consists of: Project includes removal and replacement of various partial BAS systems operating various portions of MSHS. Replacement will consist of an open-protocol Building Automation System featuring a single vendor. Configure the system such that all of it works in concert with existing HVAC units/equipment. Scope does not include replacement of any equipment other than those directly related to controls - units found to be deficient shall be identified and would be additional scope beyond that of this project.
00 9100 ADDENDA (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
00 9102 Addenda 002_246EX06.400_M-S HS BAS Upgrade 1.7 MB
246EX06.400-00 9101 Addenda 001 617.7 KB
246EX06.400_M-S HS BAS Upgrade_00 9103 Addenda 003 2.0 MB