Decatur Public Schools District #61 - SELA Door and Window Replacement
The project consists of providing materials only for installation by the Owner’s own forces. Materials include exterior aluminum entrance and storefront systems, glazing, hardware, and sealant. For grant purposes, delivery of all materials is expected before December 10, 2024. Materials will be delivered to two locations for storage until work commences by the Owner during the school district’s 2025 summer break.
00 PROCUREMENT AND CONTRACT REQUIREMENTS
(click to expand/collapse)
Name | Size | ||
00 0000 - COVER SHEET | 47.9 KB | ||
00 0110 - TABLE OF CONTENTS | 40.9 KB | ||
00 0115 - LIST OF DRAWING SHEETS | 75.5 KB | ||
00 1116 - INVITATION TO BID | 40.2 KB | ||
00 2100 - INSTRUCTIONS TO BIDDERS | 136.1 KB | ||
00 4100 - BID FORM | 61.0 KB | ||
00 7200 - GENERAL CONDITIONS (AIA A201-2017) | 641.8 KB | ||
00 7300 - SUPPLEMENTARY CONDITIONS (AIA A201-2017) | 87.9 KB |
01 GENERAL REQUIREMENTS
(click to expand/collapse)
Name | Size | ||
01 1000 - PROJECT SUMMARY | 71.5 KB | ||
01 3300 - SUBMITTAL PROCEDURES | 89.9 KB | ||
01 4000 - QUALITY REQUIREMENTS | 51.8 KB | ||
01 6000 - PRODUCT REQUIREMENTS | 64.1 KB |
07 THERMAL AND MOISTURE PROTECTION
(click to expand/collapse)
Name | Size | ||
07 9200 - JOINT SEALANTS | 116.2 KB |
08 OPENINGS
(click to expand/collapse)
Name | Size | ||
08 4113 - ALUMINUM ENTRANCES AND STOREFRONTS | 129.3 KB | ||
08 5113 - ALUMINUM WINDOWS | 112.5 KB | ||
08 7100 - HARDWARE | 115.0 KB | ||
08 8000 - GLAZING | 100.3 KB |
12 FURNISHINGS
(click to expand/collapse)
Name | Size | ||
12 2413 - ROLLER WINDOW SHADES | 76.0 KB |