Out for Bid
Sort by
Date Posted
Bids due in 15 days
6/15/23 2:00pm
Arthur CUSD #305 - Summer 2023 Paving
Bids due in 15 days
BLDD Architects
Arthur, IL 61911
The project consists of: select paving work at Arthur Grade School, Atwood Hammond Grade School, and ALAH High School.
Bids due in 22 days
6/22/23 2:00pm
Pleasant Plains CUSD #8 - Farmingdale Elementary School Gym and Stage Addition
Bids due in 22 days
BLDD Architects
2473 N. Farmingdale Road, Pleasant Plains, Illinois 62677
The project consists of: A gym/stage addition to the Pleasant Plains Farmingdale Elementary School of approximately 10,885sf, including associated mechanical, electrical work, and sitework. Work also includes remodeling and air conditioning of the existing gym.
Bidding Closed
5/11/23 2:00pm
Hamilton CCSD #328 - High School Gym Floor Replacement [REBID]
Bidding Closed
BLDD Architects
Hamilton, IL 62314
The project consists of: removal and replacement of the wood athletic flooring in the High School Gym.
Bidding Closed
5/11/23 2:30pm
Hamilton CCSD #328 - High School HVAC Improvements [REBID]
Bidding Closed
BLDD Architects
Hamilton, IL 62314
The project consists of: HVAC Improvements throughout the High School including six (6) new ductless split system heat pumps for air conditioning; replacement of existing steam boiler with new steam boiler; replacement of existing steam heating controls with a new digital control system.
Bidding Closed
5/9/23 2:00pm
Heyworth CUSD #4 - 522 East Main Parking Lot
Bidding Closed
BLDD Architects
Heyworth, IL 61745
The project consists of: A new parking lot at 522 East Main and improvements to the off-street parking along the north end of School St.
Bidding Closed
5/10/23 10:00am
Spoon River College - EDA Grant Implementation [REBID]
Bidding Closed
BLDD Architects
23235 North Country Road 22, Canton, IL 61520
The project consists of: Remove and replace shop exhaust ventilation systems, Remove and replace overhead exhaust in old Auto Shop, Jib crane in diesel shop area, Prefabricated Mezzanine construction, Radiant heat tubes to replace shop heaters, Paint shop floor & walls, New air compressor/dryer to serve all Votec, Replace air lines throughout Votec, Replace overhead doors (3), Replace shop lights with LED fixtures, Add large, air circulating fans to shop.
Knoxville CUSD #202 - Greenhouse and Lab Space
BLDD Architects
Knoxville, IL 61448
The project consists of the construction of a prefabricated 20’x40’ pole barn to be used as a lab space and 15’x36’ lean-to greenhouse on concrete slab and foundation.