Out for Bid
Sort by
Date Posted
Bids due in 10 days
12/12/23 2:00pm
Monticello CUSD #25 - Athletic Outbuilding
Bids due in 10 days
BLDD Architects
Monticello, IL
The project consists of: The construction of a 5000 sf facility to house weight room, public toilets, concessions, and parking lot, to be located on the south side of Kratz Road. Building will be a one story masonry bearing cavity wall with membrane roof, aluminum windows and entries. Interior finishes include paint, rubber athletic flooring, and ACT and gyp ceilings. Specialties include interior casework, exterior canopy, EIFS cornice and exterior and interior environmental graphics. Project also includes utilities (gas, water, electrical, storm water, sanitary, and fiber optic connections) and corresponding MEP systems. Site amenities include concrete parking, driveway and sidewalks, relocated entry gate and landscaping. Targeted completion date is August 31, 2024.
Bidding Closed
11/14/23 2:00pm
Springfield PSD #186 - Environmental Contracting Removal of Edison Wing Gas Tank at Lanphier HS
Bidding Closed
BLDD Architects
1300 N. 11th Street, Springfield, IL 62702
Generally, the work includes the excavation and removal of one 12,000-gallon heating oil underground storage tank and associated piping at the property and the proper remediation of soils and containments Backfilling will be by others.
Bidding Closed
11/21/23 10:00am
DPS District #61 - Muffley Elementary School Door and Window Replacement
Bidding Closed
BLDD Architects
Decatur, IL
The project consists of providing materials only for installation by the Owner’s own forces. Materials for Bid Package A include exterior aluminum entrance and storefront systems, metal doors and frames, sheet metal, glazing, hardware and sealant. Materials for Bid Package B include roller window shades.
Bidding Closed
11/14/23 2:00pm
Arthur CUSD #305 - Grade School Toilet Room Upgrades
Bidding Closed
BLDD Architects
Arthur, IL 61911
The project consists of toilet room upgrades at Arthur Grade School (AGS) and Lovington Grade School (LGS). Scope includes two (2) pairs of toilet rooms at AGS and a single pair of toilet rooms at LGS. Scope includes toilet fixtures, partitions, ceiling, lighting and wall finishes. Urinals at boys’ restrooms to be reconfigured to be wall mounted fixtures including removal of “step”. Toilet accessories will be provided by Owner and installed by contractor.
Bidding Closed
11/14/23 2:00pm
Delavan CUSD #703 - Elementary School Re-Roofing Project
Bidding Closed
BLDD Architects
Delavan, IL 61734
The project consists of: Full tear off and replacement of approximately 9,650 sf of the existing elementary school roof.
Bidding Closed
11/8/23 10:00am
Spoon River College - Votech Building RTU Replacement
Bidding Closed
BLDD Architects
Canton, IL 61520
The project consists of a RTU replacement at the Votech Building, located on the Spoon River College Canton Campus.
Bidding Closed
10/11/23 2:00pm
Athens CUSD #213 - AC and Interiors Phase 3 Work
Bidding Closed
BLDD Architects
Cantrall Elementary School, #1 Braves Lane, Cantrall, Illinois 62625
Phase 3 work includes interior remodeling at the Cantrall Elementary School, located at #1 Braves Lane in Cantrall, IL. The project includes remodeling of two toilet rooms and a complete renovation of a classroom wing within the school. Alternative bids will also be received for the replacement of exterior windows and installation of acoustical panels within an existing gymnasium.