Out for Bid

Bids due in 25 days
2/28/23 2:00pm
Arthur CUSD #305 - Track Resurfacing
Bids due in 25 days
BLDD Architects
Arthur, IL 61911
The project consists of: removal and off-site disposal of the existing rubber and recoating with new rubber surface.
Bids due in 13 days
2/16/23 10:00am
Mahomet-Seymour CUSD #3 - Summer 2023 Paving
Bids due in 13 days
BLDD Architects
Mahomet, IL 61853
The project consists of: Paving improvements at the Mahomet-Seymour Jr. High Building (MSJH) and Lincoln Trail Elementary School (LTE).
Bids due in 27 days
3/2/23 2:00pm
Riverton CUSD #14 - High School Restroom Remodel
Bids due in 27 days
BLDD Architects
Riverton, IL 62561
The project consists of: Interior renovation of two restrooms including plumbing fixture replacement, new finishes, mechanical & electrical work.
Bids due in 13 days
2/16/23 10:00am
Mt. Zion CUSD #3 - Grade School Gym Floor Replacement
Bids due in 13 days
BLDD Architects
Mt. Zion, IL 62549
The project consists of replacement of the wood athletic gym flooring at Mt. Zion Grade School located at 725 West Main Street, Mt. Zion, IL.
Bids due in 18 days
2/21/23 10:00am
Manteno CUSD #5 - Middle School Roof Replacement Summer 2023 [REBID]
Bids due in 18 days
BLDD Architects
Manteno, IL 60950
The project consists of roof replacement on 7 different roof areas of the Manteno Middle school as designated on the drawings. There are (2) alternates that divides the roof sections up from what is base bid and what is an alternate as shown on the drawings.
Bids due in 19 days
2/22/23 10:00am
St. Joseph-Ogden CHSD #305 - High School Parking Lot
Bids due in 19 days
BLDD Architects
301 N Main St., St. Joseph, IL 61873
The project consists of: A new parking lot at the NE corner of the school property. The existing adjacent concrete parking lot will be restriped as the layout will change. The project also includes new parking lot lighting, power to a future marquee sign as well as underground detention below the new parking lot. Parking lot striping and signage is also part of the project.
Bids due in 20 days
2/23/23 2:00pm
Pleasant Plains CUSD #8 - High School Gym Air Conditioning
Bids due in 20 days
BLDD Architects
500 N. Cartwright, Pleasant Plains, IL 62677
The project consists of: The removal of the old boiler system serving the West Gym and Lockers along with some associated piping and unit heaters, tying the remaining hot water piping into the main building hot water system, replacing some cabinet unit heaters in the locker rooms, and providing a new rooftop air handler to condition the west gym. There will also be miscellaneous electrical and gas piping work.
Bids due in 4 days
2/7/23 2:00pm
Gibson City-Melvin-Sibley CUSD #5 - High School Greenhouse
Bids due in 4 days
BLDD Architects
815 N. Church Street, Gibson City, IL 60936
The project will include demolition of the existing garage north of the high school, construction of an approximately 30’x48’ greenhouse, and sidewalks on the perimeter of the greenhouse.
Bidding Closed
2/2/23 10:00am
DPS District #61 - 2023 Roofing Projects - E.J. Muffley and Parsons Elementary Schools
Bidding Closed
BLDD Architects
Decatur, IL
The project consists of a partial roof replacement at E.J. Muffley Elementary School and roof restoration at Parsons Elementary School.
Knoxville CUSD #202 - Greenhouse and Lab Space
BLDD Architects
Knoxville, IL 61448
The project consists of the construction of a prefabricated 20’x40’ pole barn to be used as a lab space and 15’x36’ lean-to greenhouse on concrete slab and foundation.