Out for Bid
Bids due in 16 days
4/4/24 2:00pm
Mahomet-Seymour CUSD #305 - High School BAS Upgrade
Bids due in 16 days
BLDD Architects
Mahomet, IL 61853
The project consists of: Project includes removal and replacement of various partial BAS systems operating various portions of MSHS. Replacement will consist of an open-protocol Building Automation System featuring a single vendor. Configure the system such that all of it works in concert with existing HVAC units/equipment. Scope does not include replacement of any equipment other than those directly related to controls - units found to be deficient shall be identified and would be additional scope beyond that of this project.
Bids due in 9 days
3/28/24 2:00pm
Electronic bidding
Vermillion Association for Special Education (VASE) - Restroom Remodel
Bids due in 9 days
BLDD Architects
Tilton, IL 61833
The project consists of the renovation of two sets of restrooms.
Bids due today at 10:00am
3/19/24 10:00am
Pawnee CUSD#11 - Chiller Replacement
Bids due today at 10:00am
BLDD Architects
Pawnee, Illinois 62558
The project calls for the removal and replacement of an existing chiller, pumps and related accessories at Pawnee High School. Electrical work is also commensurate with the project.
Bids due in 2 days
3/21/24 2:30pm
Warrensburg-Latham CUSD #11 - Middle School Renovations
Bids due in 2 days
BLDD Architects
Warrensburg, IL 62573
The project consists of the replacement of select flooring, ceilings, and lighting within Warrensburg-Latham Middle School. The work will be in (2) phases, (1) phase during summer break of 2024, and (1) phase during summer break of 2025. Work will be coordinated with that of an asbestos abatement project under a separate contract.
Bidding Closed
3/7/24 2:00pm
Arthur CUSD #305 - Summer 2024 Paving
Bidding Closed
BLDD Architects
Arthur, IL 61911
The project consists of select paving work at Lovington Grade School.
Bidding Closed
2/27/24 2:00pm
Tri-Valley CUSD #3 - Chiller-Condenser Replacement
Bidding Closed
BLDD Architects
Downs, IL 61735
The project consists of: replacing the 50-ton chiller at the Elementary School and four roof-mounted condensers (two-60 ton and two-40 ton) at the Middle School. All pieces of equipment will be integrated into the building’s existing digital control system and all modern measures, from a control perspective, will be included.
Bidding Closed
2/15/24 2:00pm
Williamsville CUSD #15 - Williamsville-Sherman High School Flooring Replacement
Bidding Closed
BLDD Architects
Williamsville, IL 62693
The project consists of: High School classrooms and corridors: replace existing carpet with carpet tile. High School stairwells: replace existing flooring with rubber tread/risers and rubber flooring at landings.
Bidding Closed
2/6/24 2:00pm
Okaw Valley CUSD #302 - ES Summer 2024 Improvements
Bidding Closed
BLDD Architects
Bethany, IL
The project consists of: Work at the Okaw Valley Elementary School (OVES) in Bethany, IL. The Work consists of renovations to (4) classrooms housing the district’s Pre-Kindergarten and Kindergarten programs; including finishes, casework, lighting, and addition of A/C. Work also includes the enlargement and reconfiguration of (2) single-user toilet rooms within (2) of the classrooms; consisting of relocation and replacement of plumbing fixtures, finishes, toilet room accessories, lighting, and exhaust system.
Bidding Closed
1/9/24 2:00pm
Richland County CUSD #1 - High School Roof Replacement 2024 Project
Bidding Closed
BLDD Architects
Olney, IL 62450
The project consists of the full tear off and replacement of areas HS15, HS19, HS23, and HS34 (approximately 5,300 sf) at the High School for Richland County CUSD #1.
Bidding Closed
12/12/23 2:00pm
Monticello CUSD #25 - Athletic Outbuilding
Bidding Closed
BLDD Architects
Monticello, IL
The project consists of: The construction of a 5000 sf facility to house weight room, public toilets, concessions, and parking lot, to be located on the south side of Kratz Road. Building will be a one story masonry bearing cavity wall with membrane roof, aluminum windows and entries. Interior finishes include paint, rubber athletic flooring, and ACT and gyp ceilings. Specialties include interior casework, exterior canopy, EIFS cornice and exterior and interior environmental graphics. Project also includes utilities (gas, water, electrical, storm water, sanitary, and fiber optic connections) and corresponding MEP systems. Site amenities include concrete parking, driveway and sidewalks, relocated entry gate and landscaping. Targeted completion date is August 31, 2024.