Out for Bid

Bids due in 13 days
4/29/21 10:30 am
Manteno CUSD #5 - Middle School Drop-off Drive Improvements
BLDD Architects
Manteno, IL 60950
The project consists of: Removal of the existing asphalt drop-off drive, curb and concrete sidewalk on the NE side of the Manteno Middle School as shown on the drawings. The project will utilize Full-Depth Reclamation (FDR) for the entirety of the drop-off drive as well as for the parking lot, which is an alternate bid as shown on the drawings and specifications. A new asphalt surface will be installed for the drop-off drive as well as the parking lot and new striping will be installed at both areas. The existing curb and sidewalk on the south and west side of the drive will be completely replaced with a new concrete curb and sidewalk. The project also includes grading, seeding, and new drainage within the areas of construction.
Bids due in 25 days
5/11/21 2:00 pm
Richland Community College - 2021 Protection, Heatlh, and Safety Poject Implementation
BLDD Architects
One College Park, Decatur, IL 62521
The project consists of: A Service Drive Improvement and Masonry Restoration.
Bids due in 5 days
4/21/21 9:00 am
Electronic bidding
DPS District #61 - Parsons Site Work
BLDD Architects
Decatur, IL
Project consists of: Site related work at Parsons School.
Bidding Closed
4/15/21 2:30 pm
DPS District #61 - Johns Hill Magnet School Performance Lighting Package
BLDD Architects
Decatur, IL
The project consists of: Furnishing a performance lighting package for Johns Hill Magnet School.
Bids due in 4 days
4/20/21 2:00 pm
PORTA CUSD #202 - High School Greenhouse
BLDD Architects
17651 Bluejay Rd, Petersburg, IL 62675
The project consists of: The construction of a prefabricated 24'x48' greenhouse with associated equipment on a concrete slab and foundations.
Bidding Closed
4/14/21 2:00 pm
Arthur CUSD #305 - Arthur Summer 2021 Roofing Project
BLDD Architects
126 E Lincoln St., Arthur, IL 61911
The project consists of: Roofing work at both Lovington Grade School and Arthur Grade School. Work at Lovington include installation of a fluid applied roofing system on area 2 with a 20-year warranty. Work at Arthur Grade School includes replacement of roof area 5, with a 30-year warranty, and alternate bid pricing for installation of a fluid applied system on areas 6,7,8 with a 15-year warranty.
Bidding Closed
4/6/21 2:00 pm
Williamsville-Sherman CUSD #15 - Storage Building
BLDD Architects
Williamsville, IL 62693
The project consists of: A 60'x68' post-frame wood storage building, with concrete slab on grade, overhead doors, man doors, and power/lighting attached to an existing post framed wood storage building.
Bidding Closed
4/7/21 2:00 pm
Richland County CUSD #1 - High School Roof Replacement
BLDD Architects
Olney, IL 62450
The project consists of: All the work associated with the re-roofing of the High School at Richland County CUSD #1.
Bidding Closed
4/1/21 2:00 pm
Eureka CUSD #140 - Roofing Work at the Eureka HS and MS, and Davenport ES
BLDD Architects
Eureka, IL 61530
The project consists of: Roofing work at Eureka High School, Eureka Middle School, and Davenport Elementary.
Bidding Closed
4/6/21 3:00 pm
Central SD #51 - Summer 2021 Roof Work
BLDD Architects
Washington, IL 61571
The project consists of: Roof work on roof work areas 1,2,3, and 4 at the Central SD 51 Intermediate School.