Richland Co. CUSD #1 - High School South Parking Lot Improvements
The project consists of improvements to the entire south parking lot at Richland Co. High School.
Plan Holders
Date | Company | Contact | Bid Categories |
4/14/24 4:24 pm |
BERGSTROM CONSTRUCTION ENTERPRISES LLC
5045 N IL HWY 130 Olney, IL 62450-3743 |
Chelsey Bergstrom
President
Tel: 6188436611
Fax: 0000000000
|
01 Construction Manager 01 General Contractor 02 4000 Demolition and Structure Moving 02 5000 Site Remediation 03 3000 Cast-in-Place Concrete 03 4000 Precast Concrete 03 CONCRETE 31 EARTHWORK 32 1200 Asphalt Paving 32 1313 Concrete Paving 32 3000 Site Improvements 33 SITE UTILITIES |
4/3/24 6:38 pm |
BLDD Architects
100 N. Merchant St. Decatur, IL 62523 |
Mark Ritz
Tel: (844) 784-4440
|
|
4/3/24 6:38 pm |
BLDD Architects
100 N. Merchant St. Decatur, IL 62523 |
Liz Kessinger
Tel: (844) 784-4440
|
|
4/5/24 11:41 am |
Central Illinois Plan Room
1620 S 5th Street Springfield, IL 62703 |
Krystle Miller
Tel: 2176791077
Fax: xxxxx
|
00 PLANROOM |
4/6/24 6:53 am |
ConstructConnect
3825 Edwards Rd Cincinnati, OH 45209 |
Morgan Stinson
Tel: 8003642059
Fax: 866.570.8187
|
00 PLANROOM |
4/4/24 10:09 pm |
Decatur Blueprint, Inc.
230 W. Wood St. Decatur, IL 62523 |
Blue Production
Digital Production
Tel: (217) 423-7589
Fax: (217) 423-7580
|
00 PLANROOM |
4/4/24 7:35 am |
Effingham Asphalt
1601 W Wabash Ave Effingham, IL 62401 |
Gregg Kabbes
Tel: 12173422151
Fax: 2173422154
|
01 AHJ - Government 01 Construction Manager 01 Design Consultant 01 GENERAL REQUIREMENTS 01 General Contractor 01 Owner 01 Supplier 01 Using Agency 02 0000 Supplier 02 4000 Demolition and Structure Moving 02 5000 Site Remediation 02 EXISTING CONDITIONS 31 0000 Supplier 31 6000 Special Foundations and Load-Bearing Elements 31 7000 Tunneling and Mining 31 EARTHWORK 32 0000 Supplier 32 1200 Asphalt Paving 32 1313 Concrete Paving 32 3000 Site Improvements 32 8000 Irrigation 32 9000 Planting 32 EXTERIOR IMPROVEMENTS 33 0000 Supplier 33 SITE UTILITIES |
4/12/24 1:21 pm |
Enlow Inc
3694 E Twin Bridge Ln Olney, IL 62450 |
Josh Enlow
President
Tel: 16185542601
Fax: 6185542601
|
01 General Contractor 02 4000 Demolition and Structure Moving 31 EARTHWORK 33 SITE UTILITIES |
4/3/24 6:40 pm |
GHR Engineers & Associates, Inc.
1615 S. Neil Street Champaign, IL 61820 |
Lucas McGill
Tel: (217) 356-0536
|
|
4/4/24 10:09 pm |
Homes by Schuetz
4820 E Post Ln Olney, IL 62450 |
Chad Schuetz
Tel: 6188388096
Fax: 6183954425
|
|
4/4/24 10:10 pm |
JB Esker and Sons, Inc
212 W Main St Teutopolis, IL 62467 |
Jared Sudkamp
Estimator
Tel: 217-857-6543
Fax: 217-857-3209
|
|
4/8/24 8:51 am |
Kieffer Bros Construction
933 W 3rd Street Mount Carmel, IL 62863 |
Douglas Kieffer
Tel: 6182625108
Fax: 618-263-3215
|
01 General Contractor |
4/3/24 6:43 pm |
Martin Engineering Company
3695 S. 6th St. Frontage Road West Springfield, IL 62703 |
TJ Keys
|
|
4/24/24 3:52 pm |
Olney Quality Electric, Inc
4082 N HIGGINSWITCH RD NOBLE, IL 62868 |
RENA MERITT
Secretary
Tel: 6188387979
Fax: 6183927100
|
26 ELECTRICAL |
4/3/24 6:39 pm |
Richland County CUSD #1
1100 E. Laurel Street Olney, IL 62450-2508 |
Chad LeCrone
Assistant Superintendent
|
|
4/3/24 6:39 pm |
Richland County CUSD #1
1100 E. Laurel Street Olney, IL 62450-2508 |
Jason Fox
Superintendent
|
|
4/23/24 6:24 am |
Sandschafer Electric Inc
15421 E. State Hwy 33 Teutopolis, IL 62467 |
Brent Sandschafer
Tel: 2173477326
Fax: 217-324-9288
|
00 PLANROOM 01 AHJ - Government 01 Construction Manager 01 Design Consultant 01 GENERAL REQUIREMENTS 01 General Contractor 01 Owner 01 Supplier 01 Using Agency 02 0000 Supplier 02 4000 Demolition and Structure Moving 02 5000 Site Remediation 02 EXISTING CONDITIONS 03 0000 Supplier 03 3000 Cast-in-Place Concrete 03 4000 Precast Concrete 03 8000 Concrete Cutting and Boring 03 CONCRETE 04 0000 Supplier 04 2000 Unit Masonry 04 MASONRY 05 0000 Supplier 05 1000 Structural Metal Framing 05 1200 Structural Steel Erection 05 2000 Metal Joists 05 3000 Metal Decking 05 4000 Cold-Formed Metal Framing 05 5000 Metal Fabrications 05 7000 Decorative Metal 05 METALS 06 0000Supplier 06 1000 Rough Carpentry 06 2000 Finish Carpentry 06 4000 Architectural Woodwork 06 WOOD, PLASTICS, AND COMPOSITES 07 0000 Supplier 07 1000 Damproofing and Waterproofing 07 2000 Thermal Protection 07 2500 Weather Barriers 07 3000 Steep Slope Roofing 07 4000 Roofing and Siding Panels 07 4100 Insulated Metal Panels 07 4600 Metal Roofing 07 5000 Membrane Roofing 07 6000 Flashing and Sheet Metal 07 8000 Fire and Smoke Protection 07 9000 Joint Protection 07 THERMAL AND MOISTURE PROTECTION 08 0000 Supplier 08 1000 Doors and Frames 08 3000 Specialty Door and Frames 08 4000 Entrances, Storefronts and Curtain Walls 08 5000 Windows 08 6000 Roof Windows and Skylights 08 7000 Hardware 08 8000 Glazing 08 9000 Louvers and Vents 08 OPENINGS 09 0000 Supplier 09 1000 Plaster and Gypsum Board 09 2000 Tiling 09 3000 Ceilings 09 4000 Flooring 09 5000 Wall Finishes 09 6000 Acoustic Treatments 09 6400 Wood Athletic Flooring 09 6500 Resilient Athletic Flooring 09 7000 Paints and Coatings 09 FINISHES 10 0000 Supplier 10 1000 Information Specialties 10 2000 Interior Specialties 10 3000 Fireplaces and Stoves 10 4000 Safety Specialties 10 5000 Storage Specialties 10 7000 Exterior Specialties 10 8000 Other Specialties 10 SPECIALTIES 11 0000 Supplier 11 4000 Foodservice Equipment 11 5000 Educational and Scientific Equipment 11 6500 Athletic Equipment 11 7000 Healthcare Equipment 11 EQUIPMENT 12 0000 Supplier 12 1000 Art 12 2000 Window Treatments 12 3000 Casework 12 3500 Science Casework 12 4000 Furnishings and Accessories 12 5000 Furniture 12 6000 Multiple Seating 12 6100 Fixed Audience Seating 12 9000 Other Furnishings 12 FURNISHINGS 13 0000 Supplier 13 1000 Special Facility Components 13 2000 Special Purpose Rooms 13 3000 Special Structures 13 3400 Pre-Engineered Metal Buildings 13 3410 Bleachers / Grandstands 13 4000 Integrated Construction 13 5000 Special Instrumentation 13 SPECIAL CONSTRUCTION 14 0000 Supplier 14 1000 Dumbwaiters 14 2000 Elevators 14 3000 Escalators and Moving Walks 14 CONVEYING EQUIPMENT 21 0000 Supplier 21 FIRE SUPPRESSION 22 0000 Supplier 22 PLUMBING 23 0000 Supplier 23 1000 Heating 23 2000 Ventilation 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) 25 0000 Supplier 25 1000 Controls 25 3000 BAS 25 INTEGRATED AUTOMATION 26 0000 Supplier 26 ELECTRICAL 27 0000 Supplier 27 2000 Data Communications 27 4000 Audio-Video Communications 27 COMMUNICATIONS 28 0000 Supplier 28 3000 Security Detection, Alarm and Monitoring 28 3100 Fire Alarm 28 ELECTRONIC SAFETY AND SECURITY 31 0000 Supplier 31 6000 Special Foundations and Load-Bearing Elements 31 7000 Tunneling and Mining 31 EARTHWORK 32 0000 Supplier 32 1200 Asphalt Paving 32 1313 Concrete Paving 32 3000 Site Improvements 32 8000 Irrigation 32 9000 Planting 32 EXTERIOR IMPROVEMENTS 33 0000 Supplier 33 SITE UTILITIES |
4/4/24 10:10 pm |
Schrey Systems Inc
911 S West St PO BOX 40 Olney, IL 62450 |
Thomas OToole
Tel: 6183954157
Fax: 6183925127
|
|
4/4/24 1:41 pm |
Southern Illinois Builders Association
1468 Green Mount Road P.O. Box 1390 O'Fallon, IL 62223 |
Stephanie Foster
Tel: (618) 624-9055
Fax: (618) 624-9056
|
00 PLANROOM |